Warehouse Void Filling in Tulsa: Locking In Backfill After a Washout Repair

Foam injection gun standing on a Tulsa warehouse floor during void filling, with black hoses running back to an open dock door and an injection port in the slab

Some of our most important work disappears under the concrete as soon as it is done. This warehouse in Tulsa is a good example. Drainage problems at the building had caused significant washout under the floor, and after that the building had a repair that involved a lot of excavation. Once the excavation work was […]